Due to repair work on ESO power lines on October 6, 2025, power supply disruptions are possible in the city of Pleven
The State Electricity System Operator /ESO/ notified ERM West that on October 6, 2025, it will carry out repair work on the 110 kV power lines “Gortalov“ and “Slavyani. The activities require a change in the electricity supply scheme for electricity consumers in the city of Pleven, Pleven region.
Due to the repair activities on the ESO facilities and the change in the electricity supply scheme, on October 6, 2025, for the period from 10:30 a.m. to 1:30 p.m., power supply disruptions are possible in parts of the city of Pleven - the “Storgozia“ quarter, the “Voden“ quarter, the area around the Pleven Railway Station, the central city part and the Ninth Quarter.
ERM West, in its capacity as the operator of the electricity distribution network, is obliged to ensure safe conditions for the implementation of the repair activities on the facilities by ESO. ERM West is taking all measures to minimize inconvenience to consumers. The company is constantly ready to respond in case of need.
Information about the areas where planned outages are coming, their duration, as well as whether a specific address falls within their scope, can be found on the ERM Zapad website, in the Outages section: https://ermzapad.bg/bg/za-klienta/prekusvania/.