Unit 6 of the Kozloduy NPP was included in the country's electricity system on December 24 at 11:22 a.m. According to the requirements of the technological regulation, the loading of nuclear power will be carried out in stages, the plant's press center announced.
After passing the necessary tests, analyzes and inspections carried out by independent organizations, the defective protective membrane devices of the turbine separator superheaters located in the conventional, non-nuclear part of the unit have been replaced.
Unit 5 of the Kozloduy NPP is operating on schedule.