Last news in Fakti

Repairs change tram traffic in the "Nadezhda" underpass

The measure is valid until February 10

Feb 7, 2026 07:28 52

Repairs change tram traffic in the "Nadezhda" underpass  - 1

Changes are required in tram traffic due to major repairs to the track in the "Nadezhda" underpass from today (February 7, Saturday) to February 10 (Tuesday), the Center for Urban Mobility in Sofia (CGM) announced, quoted by dariknews.bg.

Here is the schedule with the changes:

TM 1 - is closed;

TM 6 - is divided:

• 6: Ivan Vazov residential area - "Nadezhda" underpass

• 6A: Obelya 2 residential area - Sofia North station;

TM 7 - will run on a route from Manastirski district livadi to the central railway station as follows: from the Manastirski livadi-west district along the route to the stop with code 1330 “Central Station“ on the “Hristo Botev“ blvd., to the right on the “Knyaginya Maria Luiza“ blvd., “Vitosha“ blvd., to the right on “Alabin“ ul. and to the left on “Hristo Botev“ blvd. along the route to the Manastirski livadi-west district;

TM 11 - will have a diverted route via “Knyaginya Maria Luiza“ blvd.;

TM 27 - will operate along the route from the Manastirski livadi district to the central railway station as follows: from the Manastirski livadi-west district along the route to the stop with code 1327 „Central Station“ on „Knyaginya Maria Luiza“ Blvd., left on „Hristo Botev“ Blvd. and from the intersection with „Macedonia“ Blvd. straight on the route to Manastirski Livadi-West;

TM 12 - splits:

• 12: „Journalist“ Sq. - „Nadezhda“ Overpass

• 12A: Iliyantsi - Sofia North Station;

A temporary bus line 12TM between Central Station and Sofia North Station is also opened.